Showing posts with label deming. Show all posts
Showing posts with label deming. Show all posts

Sunday, May 15, 2016

Does PDCA equal “Plan the work, work the plan (and control that)?" – I don't think so!

I don't know how this came about, but a little while ago a friend of mine (whom I highly regard, both personally as well as as a project manager) came up with the notion that PDCA implies planning, having the plan executed (do), checking the results and (re)acting if they are not up to standard.

Maybe I am mistaken and that is, what Deming really means, but the way I understand his text and for example this talk by deming himself it is quite the opposite.

The way I understand it, it is an almost direct implementation of the scientific method:

  • Plan: Formulate a hypothesis and design an experiment for its verification (on a controllable scale, including the definition of an expected outcome)
  • Do: Execute the experiment (in a more or less controlled environment)
  • Check: Verify the results from the experiment with the expected outcome
  • Act: Either implement the changes from the hypothesis or don't! – Depending on the outcome of the experiment.

Am I wrong in my interpretation?

Cheers Michael